Status: accepting bookings — FY2026
Base: Larnaca, CYRev D · 10 / 2026
Airframe · sheet metal · structure · composite

Back to airworthy,
rivet by rivet.

Independent sheet metal, structure and composite repair for business, commercial and military aircraft — structural repairs, modifications and SB/AD compliance work. Based in Cyprus, working on-site across Europe, Asia and South America.

Response
AOG & field repair
Coverage
35 locations
Standard
Type-certified data
Data plate
GRYPS-DDI
Years in service
02YY05MM
Airframes serviced
70+
Service network
35LOCATIONS
Annual capacity FY26
360DAYS
SER. 10 / 2026
Cyprus
Speciality
Sheet metal, structures, composite
Scope
Repairs, modifications, SB & AD
Regions
Europe · Asia · South America
Engagement
Scoped & quoted per project
01
Recent work
Logbook · FY24 — FY26

Recently signed off

Selected jobs from the logbook — aircraft, task and month as filed. Open one for the repair description and stage photos.

Jobs in rotation
JOB 0032
Cabin floor frame repair after blue water spillage on a Cessna 525A Citation CJ2
Cessna 525A Citation CJ2

Cabin Floor Frame Repair

06 / 2026
JOB 0031
Horizontal stabilizer rib repair on a Cessna 680A Citation Latitude
Cessna 680A Citation Latitude

Horizontal Stabilizer Rib Repair

05 / 2026
JOB 0030
Left-hand windshield frame structure replacement on a Cessna 525B Citation CJ3
Cessna 525B Citation CJ3

LH Windshield Frame Structure Replacement

04 / 2026
JOB 0029
Aft belly outer lower doubler replacement on a Cessna 525B Citation CJ3
Cessna 525B Citation CJ3

Aft Belly Outer Lower Doubler Replacement

02 / 2026
JOB 0028
Pressure bulkhead angle frame replacement on a Cessna 525B Citation CJ3
Cessna 525B Citation CJ3

Pressure Bulkhead Angle Frame Replacement

01 / 2026
JOB 0027
Seal plate replacement after blue water corrosion on a Cessna 525B Citation CJ3
Cessna 525B Citation CJ3

Seal Plate Replacement — Blue Water Corrosion

12 / 2025
JOB 0026
Finished mounting plate installed in the avionics panel
Cessna 510 Citation Mustang

Radio Modification — Equipment Mounting Plate

12 / 2025
JOB 0025
Cabin door hinge replacement on a Cessna 560XL Citation Excel
Cessna 560XL Citation Excel

Cabin Door Hinge Replacement

11 / 2025
JOB 0024
Gogo Galileo antenna installation on a Cessna 680A Citation Latitude
Cessna 680A Citation Latitude

Gogo Galileo Antenna Installation

10 / 2025
JOB 0023
Replacement cockpit skin fitted and clecoed along the fastener rows
Cessna 525C Citation CJ4

Cockpit Skin and Structure Replacement — RH and LH

07 / 2025
JOB 0022
Firewall joint on the right-hand lower pylon
Cessna 525B Citation CJ3

Lower Pylon Firewall Crack Repair — RH

06 / 2025
JOB 0021
Removed leading edge assembly with the piccolo tube in place
Cessna 750 Citation X

Piccolo Tube and Diffuser Replacement

06 / 2025
JOB 0020
Finished bore in the main landing gear door attachment lug, ready for the larger bushing
Cessna 680 Citation Sovereign

MLG Door Attachment Lug — Bore Milled for Bushing

04 / 2025
JOB 0019
Replacement nose landing gear actuator fitting set in position
Cessna 560XL Citation XLS+

NLG Actuator Fitting and Wheel Well Wall Replacement

03 / 2025
JOB 0018
Replacement splice doubler installed, showing the mix of lockbolts, blind fasteners and rivets
Cessna 650 Citation III

Horizontal Stabilizer Splice Doubler Repair

01 / 2025
JOB 0017
Tailcone to fuselage splice stringer repair on a Cessna 680A Citation Latitude
Cessna 680A Citation Latitude

Tailcone Fuselage Splice Stringer Repairs

12 / 2024
JOB 0016
Thicker-walled inserts set in the magnesium gearbox housing
Cessna 680 Citation Sovereign

Magnesium Gearbox Insert Repair — RH Engine

11 / 2024
JOB 0015
Replacement flap leading edge skin fitted and clecoed along both fastener rows
Cessna 650 Citation III

Flap Leading Edge Skin Replacement and Rib Straightening

10 / 2024
JOB 0014
Sealed stringer joint and fastener row inside the wing fuel tank
Cessna 560XL Citation XLS+

Internal Wing Fuel Tank Stringer Repair

10 / 2024
JOB 0013
Completed leading edge repair primed, with the repair boundary marked
Beechcraft King Air 260

Leading Edge Doubler Repair After Bird Strike

09 / 2024
JOB 0012
Replacement main landing gear door stiffener installed on a Cessna 560XL Citation XLS
Cessna 560XL Citation XLS+

Main Landing Gear Door Stiffener Replacement — Left and Right

09 / 2024
JOB 0011
Replacement rivets set in the lower pylon skin of a Citation XLS+
Cessna 560XL Citation XLS+

Smoking Rivet Replacement — Lower Pylon Skins

08 / 2024
JOB 0010
New wheel well box installed in the main landing gear bay of a Citation CJ2
Cessna 525A Citation CJ2

Wheel Well Box Replacement — LH and RH Main Landing Gear

08 / 2024
JOB 0009
Bonding angle installed in the battery bay of a Cessna Citation Latitude
Cessna 680A Citation Latitude

Electrical Bonding Angle — Battery Bay

07 / 2024
JOB 0008
King Air B200 on jacks in the hangar with the left wing root opened up for the frame angle repair
Beechcraft King Air B200

Upper Frame Angle Replacement — LH Wing Root

07 / 2024
JOB 0007
Replacement rib section fitted and drilled
Beechcraft King Air B200

Wing Rib and Web Replacement — LH Wing Root

06 / 2024
JOB 0006
Replacement leading edge and wing tip end cap fitted to a Cessna Citation Mustang
Cessna 510 Citation Mustang

Leading Edge Replacement After Bird Strike

06 / 2024
JOB 0005
Fuel tank retainer installed with additional rivets on a Cessna Citation CJ2
Cessna 525A Citation CJ2

Field Repair — Fuel Tank Panel Retainer

05 / 2024
JOB 0004
Hinge attachment area cleaned back and assessed
Cessna 525B Citation CJ3

Flap Hinge Fairing Replacement

05 / 2024
JOB 0003
Replacement flap fairing installed in primer on a Cessna Citation CJ3 wing
Cessna 525B Citation CJ3

Flap Fairing Replacement

05 / 2024
JOB 0002
Replacement upper pylon skin installed on a Cessna Citation XLS+
Cessna 560XL Citation XLS+

Upper Pylon Skin Replacement — Left and Right

04 / 2024
JOB 0001
Snubber fitting installed on the composite baggage door frame
Cessna 680A Citation Latitude

Baggage Door Snubber Fitting Replacement — SB680A-52-11

04 / 2024
02Services Scope of work

What we do on the airframe

Structural repair work, scoped and quoted per project — including AOG and field response.

A

Structural repairs

Damage assessment and repair to type-certified standards — corrosion removal, leading edge repair, bird strike and hard-landing damage, plus scheduled structural inspections.

Damage assessmentCorrosion removalStructural inspection
B

Modifications, SBs & ADs

Structural modifications and compliance work tied to Service Bulletins and Airworthiness Directives — reinforcement doublers, oversize bushings and fitting replacement.

Reinforcement doublersOversize bushingsFitting replacement
C

Sheet metal & composite

Doubler installations, wing skin and spar repair, cold working and swaging of fastener holes, plus composite repair — delivered on-site at authorised service centres.

Wing skin & spar repairCold working & swagingDelamination repair
D

Base maintenance

Structures and sheet metal cover during scheduled base maintenance inputs — corrosion found at inspection, panel and skin work, and repairs raised off the check — worked alongside your own team so the aircraft keeps moving.

Scheduled inputsInspection findingsPanel & skin work
E

Heavy maintenance

Hands and know-how for heavy checks and major structural work — deep inspection access, large-area repair and structural replacement, including cover when a finding grows mid-check and the slot cannot slip.

Heavy checksLarge-area repairStructural replacement

We work inside your organisation's approval and quality system — you keep the release to service, we bring the hands, the tooling and the repair experience.

Corrosion prevention & repairLeading edge repairHard landing repairBird strike repairCold working & swagingDoubler installationsWing skin & spar repairGround incident damageComposite delamination
03Locations Capacity FY2026

Where you can book us

Each country carries its own annual capacity, tracked separately, on top of an overall yearly capacity. Figures are live for the current calendar year.

Overall yearly capacity — all locations combined
360days still bookable
Cap 360 days
How capacity works
  • CountryEach location holds its own 180-day annual allowance.
  • OverallCountry allowances draw down one shared yearly total.
  • BookingLog in to request dates and see the full rules.
CodeLocationCapacity remainingDays leftStatus
Other locations available on request — logged-in areabook.gryps.aero →

Figures show days still available to book this calendar year, per country. Log in to request a booking and see the full capacity rules.

Booking Request
04About Operator record

About Gryps

Mr. D. working on the nose section of a business jet in the hangar
Fig. 01Operator

Gryps.aero specialises in sheet metal, structures and composite repair for business, commercial and military aircraft — maintenance, repairs, modifications, and compliance work tied to Service Bulletins and Airworthiness Directives.

Work began in 04 / 2024 at the Cessna Citation Service Center in Düsseldorf, within the Textron Aviation network. Alongside that, hands-on experience was built on small private aircraft in the hobbyist sector, as well as structural repair work on cargo transport aircraft.

Based in Cyprus, working on-site at authorised service locations across Europe, Asia and South America.

04 / 2024Cessna Citation Service Center, Düsseldorf — Textron Aviation network
2024 — 202670+ airframes: Citation 510 to 750, King Air B200 / B200GT
NowBased in Cyprus — on-site across 35 locations, AOG and field response
Data Vault

The files kept in the data vault are sensitive data, provided by us or by the responsible authorities and operators. They are released only to registered and authorised personnel, for the purpose the access was granted for, and may not be copied, forwarded or published. Access is logged.

Enter data vaultRegistered clients & authorised personnel only
NameMr. D.
Tel.[+357 00 000000]
Fig. 02Portrait
Document registerGRYPS - CERTIFICATES
CV09 / 2026UPDATED
German ZÜP04 / 2029VALID TO
Fuel Tank Safety03 / 2028VALID TO
EWIS03 / 2028VALID TO
Human Factors & SMS01 / 2028VALID TO
PPE03 / 2027VALID TO
Access levelRESTRICTED
Retention [10 YRS]Cyprus